    MESA Part 4 – Laying the Foundation for Change 

    This posting continues our discussion of how to apply Business Process Management methods to implementing MES. 

    In previous discussions we talked about the materials we needed to prepare for a series of Consensus Workshops.  What are Consensus Workshops?  That requires a little background. 

    What is a Consensus Workshop?

    For the selected functional areas (see below) subject matter experts from each of the affected departments or functional areas are assembled to; review the current As-Is state and shortfalls, generate a To-Be state process flow, determine how the process flow addresses the shortfalls and the company objectives and strategy, develop a list of the gaps between the To-Be state and those shortfalls left unaddressed, and address the change management issues related to the future state processes.

    What are the topics for the Workshops?

    The full list of topics available for holding Workshops follows the ISA-95 Model:

    1. Production Control
    2. Quality Assurance
    3. Maintenance Management
    4. Material and Energy Control
    5. Product Inventory Control
    6. Production Scheduling
    7. Procurement
    8. R&D
    9. Order Processing
    10. Cost Accounting
    11. Product Shipping

    Some notes on this list:  You can usually combine Material and Energy Control with Production Inventory Control under a single topic Inventory Management (as it is in the MOM).  This allows you to address raw materials, WIP, and finished goods discussions in a single workshop.  If Energy Control is a significant topic, create a separate workshop for it.  Don’t discount the Cost Accounting and Order Processing discussions, they may be short but they can be significant.  For example, determining how product unit costs are evaluated can affect critical KPI’s and incentives.

    How do we select the topics?

    As you prepare the As-Is state process flows and gather shortfalls for the way you currently do business, a picture emerges of areas that need attention or present opportunities.  You could hold a workshop for each area of the ISA-95 model, one for all the activities in Production Control, one for all the activities in Quality Management, one for all the activities in Procurement, etc.  Do you need to hold a workshop for every area?  That depends on how comprehensively you intend to apply an MES system.  Another way to look at it is to identify those areas with the most problems and the most opportunity for payback.  It’s a trade-off, expediency and short-term payback versus comprehensiveness and longer term payback.

    A few of the advantages of selecting a limited number of areas are;

    • It is usually easier to determine the true ROI for change.
    • It’s easier for participants to understand the value of the change. 
    • It requires fewer resources to implement.  

    Remember it’s a trade-off.  There are also advantages to the comprehensive approach;

    • Having a full picture of the numerous and various interfaces between systems and implementing them one time is much more efficient, 
    • Even if you don’t implement all of the future state or To-Be processes you will have a long-term plan to work towards,
    • It’s easier to implement full-scale change while you have your foot on the gas.

    Next Time:  Creating the Framework for Change

     
  • Edward Brown 11:40 am on February 9, 2010 Permalink | Reply
    Tags: BPM, , , , , Maintenance, , , , , ,   

    MESA Part 3 – Delivering Value through BPM Workshops 

    This post continues the discussion of how to apply Business Process Methods to implementing MES based on the ISA-95 standard.

    As you recall, we had to develop some material before holding consensus workshops.  It goes something like this :

    1. Use the ISA-95 definitions for manufacturing activities and determine those performed
    2. Determine the strategy and objectives of top management. 
    3. Develop an As-Is state in the form of a process flow for each activity
    4. Determine the shortfalls, issues, and requirements for each activity

    This material provides the framework and focus for consensus workshops that will be held to determine how to both address identified shortfalls, and to reach the objectives of top management.

    So, what do we expect to get out of the workshops?  In order to develop a justification and plan for reaching the aforementioned objectives, we need some supporting material:

    1. To-Be Process – This is a process flow that has been modified from the As-Is process flow we bring to the workshop for each activity.  Again, this is a high level flow that shows how the basic activities are performed and the information flows between different activities, systems, and resources.  Don’t forget to put it down on paper.  A textual description of the process flow goes a long way in clearing up the understanding of what’s going on.  I usually put this into a companion document that accompanies the process flow.
    2. Systems Footprint – Although we’d like to focus discussion on the process alone, independent of which system performs each.  As much as we’d like to believe we can start over and make everything work in an optimal way, it’s not completely practical.  There are legacy systems that already perform some functions, and initiatives for new systems that will pick up other functions.  Without getting into details, a high-level mapping of functions across existing systems will help to determine what the technical roadmap for implementation will look like.
    3. Business Case – Here’s where collecting those shortfalls in the As-Is state really pays off.  If we assign an issues Champion to bring real-life examples of each shortfall, and an estimated cost per occurence, we can start to build a case for ROI.  This goes a long way in addressing the savings and efficiency aspect of the business case, but we shouldn’t ignore lost opportunity costs.  If we consider the revenue impact of reaching the objectives laid out by top management, we can calculate the impact of increased revenue as well.  Consider the example in my previous post “MES for Competitive Advantage.”  During our workshop, we should capture how the To-Be process will address the shortfalls and provide competitive advantage.
    4. Change Management – How a company addresses change determines how successful the MES implementation will be.  It’s critical that a Change Management Champion, CMC,  attend every workshop, capture issues requiring change in related functions, departments, and systems.  The CMC will be a liason role that communicates the impact of the proposed To-Be state.  It is critical that the CMC has the full and real support of top management.  Change can be difficult and it will be important to identify areas of resistence, overcoming resistence, and determining the cost for change.  In addition to determining the impact of change, the CMC will also identify those areas that will require either modification of training or additional training.

     This is material that we develop during the workshop.  It doesn’t have to be detailed or pretty.  It does have to address the shortfalls and objectives, so keeping the conversation focused is important.   

    What workshops should we hold?  The workshops should be organized at a level high enough to capture one of the major areas in the ISA-95 framework (for example:  Quality, Production Control, Inventory Management, Maintenance, Procurement, etc).  Each workshop will address a series of activities performed for an area.  For instance, a Quality workshop might address:  Test Definitions and Distribution, Testing Procedures (in-line, at-line, off-line),  Material Review Board, MRB, procedures for rework, Quality analysis procedures).  These are by no means complete, but they should address those areas where the shortfalls are significant and are critical to meet the objectives laid out.

    Who should attend?  Representative Subject Matter Experts, SMEs, that either appear on the As-Is process flow, or subject to change with the anticipated To-Be process.   As much as manufacturing companies hate to commit these resources to these kinds of workshops, because they were hired to actually produce things, their participation is absolutely critical to the success of the proposed changes.  Without their input and consensus, there will be resistence to change that is not always possible to overcome, and mistakes made in both requirements and implementation strategy that will be costly to remedy.

    Next time – Laying the Foundation for Change

     
c
compose new post
j
next post/next comment
k
previous post/previous comment
r
reply
e
edit
o
show/hide comments
t
go to top
l
go to login
h
show/hide help
shift + esc
cancel
Follow

Get every new post delivered to your Inbox.

Join 34 other followers